If you’re having the stones delivered, ask the drivers to place the stones as close to your building site as possible so you don’t have to carry them long distances.If a pack of bricks has a volume of 20 cubic feet (0.57 m 3) and the total volume for your wall is 384 cubic feet (10.9 m 3), then you need 20 packs of bricks.Use a different formula if you are calculating the volume of a circular structure.That way you get more space under the wall for insulation. Its more normal to put the joist on top of the basement wall (on a mudsill) with a rim joist across the ends. Then multiply that by 4 to get 384 cubic feet (10.9 m 3) for the whole wall. NICK KEENAN 12:13am 1 I wouldnt focus on thermal bridging, rather on total insulation. For example, if you’re building a rectangle structure and your wall will be 6 feet (1.8 m) long, 1 foot (0.30 m) thick, and 4 feet (1.2 m) high, you need 96 cubic feet (2.7 m 3) of material for that section. Slab-on-Grade Foundation With Concrete Stem Wall and Under Slab Insulation International Association of Certified Home Inspectors (InterNACHI) 35.1K subscribers Subscribe 1K Share 104K views.Divide the volume of each pack of bricks into the volume of your wall to find out how many packs you need. Then, find out the volume of the brick type you plan on using. Use this formula for each section of your stem wall. Building a concrete block wall is one of the more involved building projects that requires careful planning and a little heavy lifting, but easy to. The formula for cubic feet is length x width x height. For unreinforced construction as shown in Figure 2a, grouting provides flexural and shear. With each construction type, walls are built by first stacking concrete masonry units. First, calculate the cubic feet of the wall you’re planning. Dry-stack concrete masonry units can be used to construct walls that are grouted or partially grouted unreinforced, reinforced or prestressed or surface bonded. Water and weather wear down the mortar used to join the CMU blocks together - this can cause leaks. Improperly reinforced CMU blocks produce weak foundations. After you've planned the perimeter for your wall, you can calculate the amount of materials you need. A CMU block wall often requires installing an air and moisture barrier, which adds another trade and more labor to the foundation project.